Continue to check this page for updates about vehicle parking during the paving portion of the project.
THIS PAGE WILL BE UPDATED WITH DETAILED INFORMATION FOR PHASE 2 OF THE PROJECT ONCE THOSE DETAILS ARE AVAILABLE.
IMPORTANT: During the paving work, the roadway being paved will be closed. Vehicle traffic is not permitted on the roadway during the work or while the asphalt is cooling and curing.
If you need to use your vehicle on the day your roadway is being paved, please move it to an approved parking location off the roadway by 7:00 a.m. on the day the work is scheduled.
Any vehicle parked in your driveway or garage during the paving work will not be able to leave until the roadway is reopened. Please plan ahead, as the roadway will remain closed for most of the day while work is in progress.
Any vehicle left on the roadway during the paving project will be towed at the vehicle owner's expense. No exceptions!
Overnight street parking and overnight parking at the clubhouse will be permitted throughout the duration of the paving project to accommodate residents that need to use their vehicles while their road is being paved. Below are maps indicating the approved parking areas for each section of the project. The parking areas are marked in pink (think Pink = Parking).
NOTE: Overnight parking will not be permitted on any newly paved roadway to help protect the new pavement.
Parking information is listed below for each section of the paving work.
October 26, 2026:
Camella Lane
The approved parking locations for this portion of the project are: Hampton Lake Dr. and Heritage Point Dr. south of 20113 Heritage Point Dr. Residents may park at the clubhouse as well.
Parking is not permitted on Heritage Point Dr. north of 20113 Heritage Point Dr. to ensure the large equipment can maneuver to and from all the work areas.
October 27, 2026:
Cypress Crossing Court
The approved parking locations for this portion of the project are: Heritage Point Dr. south of 20216 Heritage Point Dr., Chestnut Grove Dr., and Hampton Lake Dr. Residents may park at the clubhouse as well.
Parking is not permitted on Dunham Station Dr. north of 20216 Heritage Point Dr. to ensure the large equipment can maneuver to and from all the work areas.
October 28, 2026:
Hampton Glen Dr. NOTE: Residents living on Cypress Crossing Court will not be able to access their roadway while Hampton Glen Dr. is being completed.
The approved parking locations for this portion of the project are: Heritage Point Dr. south of 20216 Heritage Point Dr., Chestnut Grove Dr., and Hampton Lake Dr. Residents may park at the clubhouse as well.
Parking is not permitted on Dunham Station Dr. north of 20216 Heritage Point Dr. to ensure the large equipment can maneuver to and from all the work areas.
October 29, 2026:
Ash Grove Lane and Chestnut Grove Dr.
The approved parking locations for this portion of the project are: Heritage Point Dr. south of 20139 Heritage Point Dr. and Hampton Lake Dr. Residents may also park at the clubhouse parking lot.
Parking is not permitted on Dunham Station Dr. or north of 20139 Heritage Point Dr. to ensure the large equipment can maneuver to and from all the work areas.
October 30, 2026:
Complete Ash Grove Lane, then complete Lomond Lane, Ryman Place, and Dunham Station Dr. partial (Addresses 8429 - 8437)
The approved parking locations for this portion of the project are: Pergola Bend, Pond Spring Way, Oak Alley Dr., Dunham station between addresses 8446 Dunham Station - 8465 Dunham Station, and Windsor Bluff Dr.
Parking is not permitted on Dunham Station Dr. east of 8446 Dunham Station Dr. or any location not stated above on Dunham Station Dr. to ensure the large equipment can maneuver to and from all the work areas.
November 3, 2026:
Finish Lomond Lane and Dunham Station Dr. partial (Addresses 8439 - 8492)
The approved parking locations for this portion of the project are: Oak Alley Dr, Pergola Bend, Pond Spring Way, and Dunham Station between addresses 8359 Dunham Station - 8434 Dunham Station.
Parking is not permitted on Dunham Station Dr. in areas not listed above to ensure the large equipment can maneuver to and from all the work areas.
November 4, 2026:
Oak Alley Dr. and Dunham Station partial (Addresses 8429 - 8437)
The approved parking locations for this portion of the project are: Pergola Bend, Pond Spring Way, and Windsor Bluff Dr.
Parking is not permitted on Dunham Station Dr. to ensure the large equipment can maneuver to and from all the work areas.
November 5, 2026:
Dunham Station Dr. partial (Addresses 8371 - 8434)
NOTE: Residents living on Cane River Way, Fair Hill Way, Pergola Bend, Pond Spring Way, Shady Hill Lane, and Windsor Bluff Dr. will not be able to access their roadway while this section of Dunham Station is being completed.
The approved parking locations for this portion of the project are: Oak Alley Dr and Dunham Station Dr. between the addresses 8446 Dunham Station - 8488 Dunham Station.
Parking is not permitted on Dunham Station Dr. in areas not listed above to ensure the large equipment can maneuver to and from all the work areas.
November 6, 2026: 8354 Dunham Station north until the roundabout.
IMPORTANT: This work will temporarily prevent vehicle access to and from the entire east side of the community. This closure will affect ALL residents on the following roadways: Dunham Station Drive (east side, all addresses between 8343 and 8492), Cane River Drive, Club Vista Lane, Fair Hill Way, Lomond Lane, Manor Club Circle, Moss Hill Lane, Oak Alley Drive, Old Town Drive, Pergola Bend, Pond Spring Way, Ryman Place, Shady Hill Lane, Walnut Grove Drive and Windsor Bluff Drive
Approved parking locations are the Clubhouse and Dunham Station Dr. west of the clubhouse. Parking is not permitted along Grand Hampton Blvd. as that roadway will be used to stage the trucks and equipment.