Asphalt/Curbing FAQs

Concrete Curbing Questions:

  • What is Miami curbing?
    • Miami curbing is the low-profile concrete curb that helps direct water runoff and provides a clean edge along roadways and lawns.
  • Which curbs will be replaced?
  • How long will it take for the new concrete to cure?  
    • Up to 72 hours.
  • Can I drive over new curbing?
    • No. Please avoid driving over newly poured curbs until the barricades have been removed to prevent damage.
  • Will I lose access to my driveway during curbing work?
    • Yes, temporarily, if you have a portion of the curbing being replaced in front of your driveway. You’ll be notified in advance and asked to park your vehicle on the roadway during the work and curing time.

Asphalt Milling Questions:

  • What happens during milling?
    • A milling machine grinds off the top layer of old asphalt. This prepares the surface for a new overlay and ensures proper bonding between layers.
  • Will the roads be drivable during/after milling?
    • Yes, but the surface will be rough and uneven. Please drive slowly and use caution to avoid loose gravel or debris.
  • Will there be access to my home during milling?
    • Access may be limited for short periods at most, about 15–30 minutes, while crews work directly in front of your driveway. Once the milling machine passes, you’ll be able to access your driveway.
  • Will trash pickup, mail delivery, and emergency access continue?
    • Yes, all vendors, deliveries, mail, etc. will continue during the milling phase.

Asphalt Paving Questions:

  • What happens during the paving phase?
    • After milling and cleanup, a new layer of asphalt is laid down using paving machines and compacted with rollers. This creates a durable, smooth, black surface.
  • Will roadways be closed during paving?
    • Yes.  During the pavement portion, the roadway being paved will be closed.
  • How long will roads be closed?
    • Roads can be closed for up to 4 hours after paving is completed on that roadway.
  • When can I drive on the new pavement?
    • After the pavement cools and the roadway is deemed safe to drive on.
  • Will trash pickup, mail delivery, and other vendor access continue?
    • No. No vendors, deliveries, mail, etc. will be permitted to access the roadway until it is cured and reopened.
  • Where can I park my vehicle if I will need to use it while my roadway is closed?

Garbage/Recycling Pick up and Vendor Questions:

  • Will garbage and recycling be picked up during the project?
    • Waste removal will not occur on the day your road is being paved. If your regular pickup day falls on a paving day, collection will resume on your next scheduled service day. Waste removal will continue during all other parts of the project.
  • What should I do with my garbage and recycling bins on paving day
    • Do not place bins on the street or curb while work is being completed. Please keep bins off the roadway during paving operations to avoid interference with the work or damage to equipment.
  • Can landscaping, cleaning, or other home service vendors come on the day of paving?
    • No. All vendors must be notified in advance that they will not be permitted to access your street while paving or curbing work is underway. This includes landscapers, pressure washing, deliveries, movers, pool maintenance, pest control, and similar services.
  • Are there any exceptions for vendor access?
    • No exceptions will be made. For safety and quality reasons, no vehicles or vendors will be allowed on closed roadways.
  • What should I do if I already have a vendor scheduled on my paving day?
    • Please contact your vendors as soon as you receive your project schedule to reschedule their services for a day when your road is open.

Mail and Package Delivery Questions:

  • Will mail be delivered while my roadway is closed?
    • No, all regular mail via the USPS will be stopped while the roadway is closed.  The Association will notify USPS of the schedule of road closures and they will hold the mail for those roads while the roadway is closed.  Once the roadway is reopened, they will deliver the mail per their normal schedule.
  • What about packages? 
    • We will be working closely with package delivery drivers to assist with the delivery of packages that arrive throughout the day. We will have the Grand Hampton golf cart and an additional small vehicle available to transport packages via sidewalks of impacted areas. We cannot guarantee that every package will be delivered as unforeseen circumstances may prevent us from being able to assist a delivery driver. Some deliveries may need to be temporarily denied depending on the timing and stage of work when the driver arrives.
  • Will there be a designated area for package pick up and drop off?
    • No, there will not be a package pick-up/drop-off location within the community. Throughout the majority of the project, the staff will be "in the field", so delivery drivers will not have access to the interior of the clubhouse. Packages are not permitted to be left unattended in the clubhouse or outside of the clubhouse.  Any package attempted to be delivered at the clubhouse will not be accepted.  
  • What can residents do to help with package deliveries? 
    • If you have the option to reschedule packages, we strongly encourage doing so. Every bit helps to ensure this process goes as smoothly as possible. 

Parking Questions: 

  • Where can I park my vehicle if I will need to use it while my roadway is closed?
  • Why is it important to move vehicles by 7:00 a.m.?
    • Crews start early to stage the areas and take advantage of cooler temperatures and minimize traffic disruption. Vehicles left in the work zone delay the start of the day’s work.
  • Why can't I park on the newly paved roadways if they are closer to my home than the designated parking area? 
    • Parking typically involves rotating the tires back and forth/side to side which can cause indentations, surface marks and/or tire impressions on the new pavement.  To protect the investment of the Association, no overnight parking on the newly paved areas will be permitted during the project.
  • How were the designated parking areas created? 
    • Designated parking areas are areas that away from the work zones, and areas that will not impede the work vehicles from getting to and from the work zone.

Scheduling Questions: 

  • Where can I find the schedule for each portion of the project?
  • Will you communicate any delays in the projected schedules? 
    • Yes.  We will notify residents as quickly as possible once any delay and any schedule adjustments are confirmed. As soon as we know the impact a delay will have on the overall schedule, updates will be posted on the community website and sent via email.
  • What if it rains or the schedule changes?
    • Weather can affect paving operations. If conditions are not suitable, work will be rescheduled, and residents will be notified of updated dates.
  • How were the designated parking areas created? 
    • Designated parking areas are areas that away from the work zones, and areas that will not impede the work vehicles from getting to and from the work zone.

General Questions: 

  • How can residents help with this project:
    • The best way residents can help is by following all posted information, avoiding restricted areas, and keeping vehicles off the road during scheduled work. Cooperation allows crews to work efficiently and keeps the project on schedule.
  • What should I do if I have special needs or an unavoidable conflict (e.g., medical transport, moving day, etc.)?
    • Please contact the management office as soon as possible so accommodations can be made. Requests will be handled on a case-by-case basis and only granted in rare, special circumstances where alternate arrangements are not possible.
  • Can residents water lawns or use sprinklers during the project?
    • No. Please turn off sprinkler systems the day before and during any scheduled curbing or paving work near your home. Water can interfere with concrete curing and asphalt bonding.
  • Who can I contact with questions or concerns?
    • Please contact Association Manager Chris Haines at 813-973-8368 or chaines@melrosemanagement.com if you have any questions.
  • How can residents help keep the roads looking great after completion?
    • Avoid parking heavy vehicles (moving trucks, construction equipment, etc.) on the new asphalt for at least a week. Clean up any oil leaks promptly and report damage or drainage issues to management.