Asphalt Project

Review this page for information regarding the overall plan and details for the Miami curbing and asphalt milling and overlay project.

This page will be utilized to provide information and updates for the Asphalt Project. This is an important upcoming construction project that will impact several roadways in our community. Phase 2 of the project is scheduled to begin in September 2026.

IMPORTANT NOTE: We will be completing all the remaining roadways on the east side of the community.  This is the area to the left of the clubhouse when entering the main entrance of the Association.  When the east section of Dunham Station Dr. is being paved, the homes on the streets that abut Dunham Station will be affected.  Please continue to follow the updates to know when each section will be affected.   

For updates about specific portions of the project, please see the webpages for the individual sections of the projects:

Concrete Curbing Updates - https://www.egrandhampton.com/concrete-work-updates/ 

Milling Work Updates - https://www.egrandhampton.com/milling-work-updates/

Paving Updates - https://www.egrandhampton.com/paving-work-updates/ 

Vehicle Parking Updates - https://www.egrandhampton.com/vehicle-parking-updates/

 

Vendor and Service Scheduling Reminder:

Start planning for road closures now!  Residents living on the following streets should begin rescheduling vendor and service appointments now for the days when your roadway will be closed for paving: Ash Grove Lane, Camella Lane, Chestnut Grove Dr., Cypress Crossing Ct., Dunham Station Dr. (east side of the community affecting all addresses between 8343 - 8492), Lomond Lane, Hampton Glen Dr., Oak Alley Dr., Ryman Place. Vendors and services that may need to be rescheduled include, but are not limited to: Pool and lawn companies, food and water deliveries, grocery deliveries, dog walkers and groomers, furniture deliveries, contractors and home repair vendors, child care services, auto detailers, plumbers, and AC vendors.  

IMPORTANT: Food delivery services such as Uber Eats, DoorDash, and other third-party vendors will not be permitted to access roadways when they are closed. There are no exceptions to this.  Any food delivery vendor ordered to an address where the road is closed that day will be turned away and the food will not be delivered. When roads are closed for paving, no vehicles will be permitted to drive or park on the roadway until it has fully cured and cooled. This rule applies to all vehicles without exception to ensure the integrity of the new asphalt surface. Please plan accordingly!

For detailed information on the specific day(s) each roadway will be closed to vehicle traffic, please visit https://www.egrandhampton.com/paving-work-updates/.

This is a major construction project for the Association, and residents should expect the presence of heavy machinery, dust, debris, and loud construction noise throughout the work period.

While every effort will be made to minimize disruptions, these conditions are unavoidable with a project of this scale. We kindly ask for your patience and planning as we work to improve the community’s infrastructure. 

The following streets will be affected during Phase 2 of the project (listed in alphabetical order):

  • Ash Grove Lane
  • Camella Lane
  • Chestnut Grove Dr. 
  • Cypress Crossing Ct. 
  • Dunham Station Dr. 
  • Lomond Lane
  • Hampton Glen Dr. 
  • Oak Alley Dr. 
  • Ryman Place
Phase II Overview

Projected Work Schedule:

Concrete Work:

Tues 09/08 - Fri 09/11

Mon 09/14 - Fri 09/18

Mon 09/21 - Fri 09/25

Mon 09/28 - Fri 10/02

Milling Work:

Mon 10/12 - Fri 10/15

Mon 10/19 - Thurs 10/22

Paving Work:

Mon 10/26 – Thurs 10/29

Mon 11/02 – Thurs 11/05

New Line Striping Work:

Fri 11/06

NOTE:  These dates are subject to change due to weather or other unforeseen delays.  We will update the webpage and notify the residents as soon as possible if there are changes to the projected schedule.

Miami Curbing Work:

The select areas in need of Miami curbing will be fully removed and replaced. As part of this work, we will be completing some sections from Phase 1 as well.  Those areas are identified below.  This process includes removing the existing curbing, removing any roots in the curbing area and pouring new Miami curbing. Important Notice: If curbing work is being completed in front of your driveway, you will not be able to access your driveway until the concrete is fully cured. Concrete typically requires up to 72 hours to cure, depending on weather conditions. During this time, please plan alternate parking arrangements in designated areas.  The new curbing will be marked with barricades.  The area cannot be driven on until the barricades are removed.  The following Lots will have sections of Miami curbing replaced abutting their Lot:

  • Ash Grove Lane 
    • 20310 Ash Grove Lane
  • Chestnut Grove Dr.
    • 20309 Chestnut Grove Dr.
    • 20311 Chestnut Grove Dr.
    • 20330 Chestnut Grove Dr.
    • 20336 Chestnut Grove Dr.
    • 20341 Chestnut Grove Dr.
    • 20348 Chestnut Grove Dr.
    • 20351 Chestnut Grove Dr.
    • 20352 Chestnut Grove Dr.
    • 20359 Chestnut Grove Dr.
  • Hampton Glen Dr.
    • 8111 Hampton Glen Dr. 
    • 8116 Hampton Glen Dr. 
  • Lomond Lane
    • 20003 Lomond Lane
    • 20009 Lomond Lane
    • 20010 Lomond Lane
  • Oak Alley Dr. 
    • 20120 Oak Alley Dr.
  • Dunham Station Dr.
    • 8354 Dunham Station Dr. 
    • 8430 Dunham Station Dr. 
    • 8451 Dunham Station Dr.
    • 8452 Dunham Station Dr. 
    • 8454 Dunham Station Dr.
    • 8455 Dunham Station Dr. 
    • 8456 Dunham Station Dr. 
    • 8458 Dunham Station Dr. 
    • 8460 Dunham Station Dr. 
    • 8461 Dunham Station Dr. 
    • 8463 Dunham Station Dr. 
    • 8466 Dunham Station Dr. 
    • 8469 Dunham Station Dr. 
    • 8471 Dunham Station Dr. 
    • 8472 Dunham Station Dr. 
    • 8474 Dunham Station Dr. 
    • 8476 Dunham Station Dr. 
    • 8477 Dunham Station Dr.
    • 8478 Dunham Station Dr. 

The following areas from Phase 1 will be completed during this phase of the project as well:

Moss Hill Way:

20216 Moss Hill Way 

Old Town Dr.:

8327 Old Town Dr. 

8329 Old Town Dr. 

8331 Old Town Dr. 

Shady Hill Drive:

20117 Shady Hill Dr.

Walnut Grove Dr.:

20403 Walnut Grove Dr. 

20414 Walnut Grove Dr. 

Windsor Bluff Dr.:

8309 Windsor Bluff Dr. 

8329 Windsor Bluff Dr. 

Milling & Overlay Work:

Following the concrete replacement, the roadways will undergo asphalt milling and overlay. During the milling stage, the top layer of existing asphalt will be ground down and removed using specialized machinery. This creates a smooth, even surface and prepares the road for the new asphalt layer. Residents can expect increased noise and vibration from milling equipment, loose gravel or uneven surfaces temporarily exposed before paving begins and construction vehicles and materials staged along the streets during active work hours.

Once milling is complete, a fresh layer of asphalt will be installed and compacted to create a smooth, durable driving surface. While paving, the roadway will be completely closed to traffic, and vehicles will not be able to enter or exit driveways until the asphalt has cured. The asphalt typically requires up to 4 hours to cool and cure before vehicle traffic can resume safely.  Please note the following during this time:

            • No one is permitted to drive or walk on freshly paved roadways until crews have reopened them.  This means that the road will be closed for up to 4 hours after the paving work is completed on the full roadway!
            • No deliveries or waste removal will be possible on affected streets during the curing period.
            • Plan ahead for parking and personal travel needs on scheduled paving days.

WHAT TO EXPECT – MILLING

 IMPORTANT:

  • DO NOT attempt to pass under or drive under the boom lift of the milling machine when in operation. Do not assume that the truck drivers or equipment operators can see or hear you as they are watching the operator for hand signals.
  • Please be aware of the crew and where they are working.  Adhere to the direction of the flag men.
  • To avoid dust collection on your vehicle, we strongly recommend that you park in a NON-WORK zone for that day, in your garage, or off property.
  • To avoid dust in the home, keep all windows closed during the milling and paving project.
  • DO NOT park any vehicle in the designated work areas as they will be towed at the owner’s expense.
  • Inform personal guests, nurses, home health care aides, service people etc. so that they are aware of the milling schedule as well.
  • All irrigation must be turned off for the entirety of the project.

WHAT TO EXPECT – PAVING

PRIMER/TAC OIL: Prior to installing the pavement, a truck will apply primer/tac oil. This material must cure or “crack” before it can be paved. DO NOT drive on the pavement when this material is down unless the contractors explicitly tell you it’s okay. This material is applied BROWN and cures to BLACK so it can cause damage to your vehicles during the curing stages. This material will track on your driveway.

IMPORTANT:

  • Please be aware of the crew and where they are working. Adhere to the direction of the flag men.
  • To avoid dust collection or damage to your vehicle, we strongly recommend that you park in a NON-WORK zone for that day, in your garage, or off property.
  • To avoid dust in the home, keep all windows closed during the paving project.
  • DO NOT park any vehicle in the drive lanes or work zones as they will be towed at the owner’s expense.
  • DO NOT allow pets to walk on new pavement when crews are still in place. Asphalt is installed at 300 degrees Fahrenheit and will burn the pads of their paws.
  • DO NOT utilize any type of wheeled device on new pavement for 24 hours to avoid damage to the wheels or tires.
  • DO NOT let children walk, ride or cross over the new pavement if the roadways are still closed. The asphalt is extremely hot and will stick to their shoes.
  • Inform personal guests, nurses, home health care aides, service people etc. so that they are aware of the paving schedule as well.
  • Reschedule any vendor services that are scheduled to complete service on the same day that paving is being completed on your street.  REMEMBER THAT NO VEHICLES, INCLUDING VENDOR VEHICLES, WILL BE PERMITTED TO ACCESS THE ROADWAYS WHILE THE ASPHALT IS COOLING!
  • All irrigation must be turned off for the entirety of the project.

 Support During the Project:

The Association, along with our vendor ACPLM, consultant Connie Lorenz, and staff members Barry and Chris, will work diligently to minimize inconveniences as much as possible. Approved parking locations for overnight street parking and parking at the clubhouse will be provided to assist residents throughout the project as well.  As we get more details and information, we will continue to update the affected lots and the overall HOA accordingly. To keep residents informed the Association is committed to completing the following actions:

  • This webpage will be updated regularly to provide updates throughout the project.
  • Door hangers will be placed at homes when work is scheduled to begin in each section.
  • Updated email notifications will be sent out regularly. 
  • Signs with QR Codes will be put around the work zone that link directly to the website for quick access from smartphones. 

THE PAVING IS DONE!  NOW WHAT?

There are some things we want you to know about that you will be seeing over the coming weeks and things that you can do to avoid them:

Protecting Sidewalks/Curbing/Drive Aprons:

What is this?
  • Sometimes there are excess oils from the paving.  It is the responsibility of each homeowner to protect their property, cars, and driveways. You can protect your driveways by sanding, using tarps held by weights at each corner, laying sheets of plywood down to cover the driveway, or roping off the driveway to prevent others from using your driveway as a turnaround. If you have pavers on your driveway, it is recommended that you put sand over the first 10 feet of the surface from the roadway. A light layer will do.
  • If any material is tracked onto the concrete, please note that this material will eventually disappear within a couple of months. Do not attempt to pressure wash the concrete for at least 30 days after the paving project as pressure washers can do severe damage to new pavement.

Spalling or Pock Marks on Asphalt:

Pock Pick
  • Spalling or pocking occurs on newly paved properties within the first 2-3 weeks. This is when drivers turn the wheels of their vehicle in a stationary position rather than a rolling start. When the wheel is turned in a stationary position it scuffs the surface of the new asphalt.
  • As other vehicles drive over these areas, they will flatten out the surface and by the time curing is complete, they will not be visible at all. This in no way affects the integrity of the pavement and is just an aesthetic flaw.
  • Heavier vehicles such as construction vehicles or garbage trucks can do extreme damage to your newly paved roadways, so make sure to inform your vendors that they will be responsible for any damage to the new roadways. When possible, keeping them off the roadways for the first 30 days will help ensure that the new pavement is cured and stable.
  • Please inform any contractors visiting your property to protect the pavement by using cardboard or plywood to avoid any type of fluid or equipment damage. Gasoline, hydraulic fluid and motor oil will cause damage to your roadways if a spill occurs.

We understand that projects of this scope can cause temporary disruptions and inconvenience, but please know that the Board of Directors, our vendor, ACPLM, our consultant, Connie Lorenz, and on-site staff Barry and Chris are committed to minimizing the impact as much as possible. We thank you in advance and appreciate your patience and cooperation during this important improvement project.

If you have any questions or concerns leading up to the project or during the project, please contact Association Chris Haines at chaines@melrosemanagement.com or 813-973-8368.